BearClaw Valley Railroad

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


Thanks Chet but it sure does not seem to be moving fast . Maybe if I worked on it rather than playing on the computer :)
 
I agree with Chet, you do get things done quickly. I think you are a bit like me, when you get an idea and start it, you can't put it down till it is finished :)
 


It sure does not seem fast to me . Especially when you cut the same little pieces over and over :) Here is where it is at now .

IMG_2358.jpg

IMG_2359.jpg

IMG_2360.jpg

Now for my step I get to go cut and glue a lot more little pieces !!!
 
Jim,

Darn, that is one HUGE Trestle and is going together quickly and very well indeed. I hope, when it comes time to build mine, I can do half as good a job as you are doing!
 
Lloyd , I do think that it will pick up and handle easily once I get all the cross bracing and horizontal bracing on . Atleast , that's the plan.

It looks like it's being BUILT 'right' and in that case it should hold together quite nicely.
 


How are you going to install the river below? Are you planning on just cutting out and lowering the subroadbed section?
 
Michael , go back to post 42 . I think that is probably the best shot to illustrate what I am doing . I had to build the canyon in 2 steps because I could not reach the back otherwise . You can see a 2x4 sticking out , that will be the continuation of the stream bed and the 2 plywood pieces on angles on the side is where the bents will sit when everything is complete . I have the rest of the frame work sitting on the floor ( it just needs some screws to put it back in position ) so I could finish the back part . The track part that is all up in the air is what the trestle will replace . I cut out the plywood and made all the provisions ( I hope ) before the track went down . Does that kind of make sense?
 
Well guys , I finally finished the trestle . It seemed like a million little pieces had to be cut and glued but I think the last one went on about 20 minutes ago . Take a look and let me know if I need to modify or rework anything . After looking at it for so long it all looks the same to me.

IMG_2361.jpg

IMG_2362.jpg

IMG_2363.jpg

IMG_2364.jpg
 
Now that the bridge is finished , I can start back on the rest of the canyon . It will be nice to get back to throwing plaster around ! There was a question about the rigidity of the bridge . Now with all the braces attached there is absolutely no flex at all . You can hold it in your hand and give it a shake and nothing moves. Time to get out to the layout now and get it in position so I can start working on foundations . I will have to get those done first so I can work the landscape up/into them.
 
Holy begeeeeeeeeebus BATMAN, that looks outstanding. That came out really nice. It sure looks like million little pieces too!
 






Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top