Northern Pacific Rocky Valley Branch Switching Layout Build


Three things…
1 Loved following the build, turned out great!
2 Looking forward to the pictures and report on the show!
3 Funny how you used the word “finished”, we’ve all that heard that before!
Thanks! It was a fun build:)

I’ll definitely post about the show!

I’m sure more projects for Rocky Valley will come along in the near future.
 
Track plan is still the same as it was during the design phase:) Not sure what post number it was but definitely on page one of this thread.
Thanks. I think I found it:

index.php
 
Last edited:



Back
Top