logandsawman
Northern Pacific history enthusiast
Backwards method for creating a layout. Filling the usable area with benchwork, getting a rough idea for the industries and general layout of the track, then building the tables.

FINALLY getting going on the new layout. The lumber is ordered and I should be putting up the benchwork this weekend.
Here is a view of how I will be cutting the plywood, and some of the floor space with some old sections of track from my old layout that I will be incorporating:


The floor tiles are 12" square and this is one end. The radius on these pre built sections is 30". The table will not be attached to the wall but set out about 8" so the heat can rise from the baseboard water heaters
Thanks for looking!! lasm

FINALLY getting going on the new layout. The lumber is ordered and I should be putting up the benchwork this weekend.
Here is a view of how I will be cutting the plywood, and some of the floor space with some old sections of track from my old layout that I will be incorporating:


The floor tiles are 12" square and this is one end. The radius on these pre built sections is 30". The table will not be attached to the wall but set out about 8" so the heat can rise from the baseboard water heaters
Thanks for looking!! lasm