I finished rebuilding my layout ~18 months ago. Other than one industrial peninsula that survived intact, I have not yet put down any ballast, scenery or structures on it. I want to have a number of op sessions to identify any weak points in track work or operational design; those will be much easier to fix before the ballast and scenery have been applied.