I rarely have more than three. One mainline freight, one switcher working the yard, and a local serving the industrial spurs. When I want to complicate my life, I also run a passenger train so I have to make sure the local and through freights get in the hole before the passenger train comes through. I've found that's about as much as one person can handle without going psychotic.![]()
One per road operator. Yard goats don't count. If fewer than four operators one per operator plus one. The plus one is a priority freight that everyone else has to get out of the way of.How many trains do you normally have running on your layout at one time?
One per road operator. Yard goats don't count. If fewer than four operators one per operator plus one. The plus one is a priority freight that everyone else has to get out of the way of.