TLOC
Well-Known Member
Good morning! It’s 27f now 43 later.
Terry said last night we have zero planned for the day. I may visit the friend today that I am building the engine shed, power plant and paper mill for. He leaves the 20th for Hawaii and Arizona for I think 3 weeks. He has the LEDs for lighting the structures. I’ll definitely have the power plant and engine shed ready to install when he returns so I’ll use what he has to light it up. The engine shed is done except for 1 light. Plus he has more paint, CA and Model Masters glue for me to pick up
The son and girlfriend landed in Japan last night. He’s now 15 hours ahead of us. They are there for fun and adventure. She is getting another installment of ink by a tattoo artist, they will see a band on tour there where they both have friends in it and they are going snowboarding. All that besides sight seeing. I’m supposed to know the details but as they text us, if I remember I’ll say something
I’m going to the LHS this morning. I’m going to buy the 2 Walthers Diesel houses he has in HO and 4 of the service platform kits. I can build one kit and try to sell it locally here and the other one for a diorama 18” x 44” for me. The size fits a part of my layout that used to be the load out for ethanol both rail and truck! If my guy in LA ends up wanting it I’ll have it for him. I’m now intrigued enough by this kit to really want to build one. I watched a video about 5 years old yesterday and it was a real time build. I could tell because he edited out nothing and his build skills were atrocious! He used so much glue it squished out of the joints. Every joint and he made no attempt to clean the overflow. When he rattle canned spray bombed it he had lots of voids but was very proud of the build. I now have watched 5 videos with a list of notes on issues I now know about. Lots of repetitive actions. There are 44 platform support I-beams and 154 rail supports. Only 2 videos though went into the building of the walls that are flimsy. 1 guy did add support. Do I need another project? No! But I can put this on my pull out bench or take it to the daughter’s work shop and assemble it there when I feel like it. Either place I can push it out of the way not to interfere with anything else going on. The paper mill for the friend if I work on it 10 hours a week will still take me months. I now have enough plus extra styrene parts to complete the power plant and start the paper mill structures that has been approved but with less details. So when I get tired of the paper mill I can switch. No, I will not do a thread build on it!
Enjoy your day
Terry said last night we have zero planned for the day. I may visit the friend today that I am building the engine shed, power plant and paper mill for. He leaves the 20th for Hawaii and Arizona for I think 3 weeks. He has the LEDs for lighting the structures. I’ll definitely have the power plant and engine shed ready to install when he returns so I’ll use what he has to light it up. The engine shed is done except for 1 light. Plus he has more paint, CA and Model Masters glue for me to pick up
The son and girlfriend landed in Japan last night. He’s now 15 hours ahead of us. They are there for fun and adventure. She is getting another installment of ink by a tattoo artist, they will see a band on tour there where they both have friends in it and they are going snowboarding. All that besides sight seeing. I’m supposed to know the details but as they text us, if I remember I’ll say something
I’m going to the LHS this morning. I’m going to buy the 2 Walthers Diesel houses he has in HO and 4 of the service platform kits. I can build one kit and try to sell it locally here and the other one for a diorama 18” x 44” for me. The size fits a part of my layout that used to be the load out for ethanol both rail and truck! If my guy in LA ends up wanting it I’ll have it for him. I’m now intrigued enough by this kit to really want to build one. I watched a video about 5 years old yesterday and it was a real time build. I could tell because he edited out nothing and his build skills were atrocious! He used so much glue it squished out of the joints. Every joint and he made no attempt to clean the overflow. When he rattle canned spray bombed it he had lots of voids but was very proud of the build. I now have watched 5 videos with a list of notes on issues I now know about. Lots of repetitive actions. There are 44 platform support I-beams and 154 rail supports. Only 2 videos though went into the building of the walls that are flimsy. 1 guy did add support. Do I need another project? No! But I can put this on my pull out bench or take it to the daughter’s work shop and assemble it there when I feel like it. Either place I can push it out of the way not to interfere with anything else going on. The paper mill for the friend if I work on it 10 hours a week will still take me months. I now have enough plus extra styrene parts to complete the power plant and start the paper mill structures that has been approved but with less details. So when I get tired of the paper mill I can switch. No, I will not do a thread build on it!
Enjoy your day
