this is the new HO layout i am bulding its 11' x 11' with a 5 foot hole in the center clean track and buld scearney the tables are 3' wide .
the aera right of the bridge (were the drill is now )will be my yard with a bigger staging yard (out of pic and not yet bult) .the staging yard will be entered after going under the bridge and leaving the main layout.the train will be able to curve around the yard to enter the layout (making it a run around ) . the staging yard will have three or four holding tracks per side labeld north bound and south bound.
the grade is 2% it will probley surve as a scenic divider for my town and more track and indurstry .
the aera right of the bridge (were the drill is now )will be my yard with a bigger staging yard (out of pic and not yet bult) .the staging yard will be entered after going under the bridge and leaving the main layout.the train will be able to curve around the yard to enter the layout (making it a run around ) . the staging yard will have three or four holding tracks per side labeld north bound and south bound.
the grade is 2% it will probley surve as a scenic divider for my town and more track and indurstry .
Last edited by a moderator: