railBuilderDhd
Active Member
Well folks, I'm sure you figure the day would never come when I was doing more then just a track plan. LOL Here are a couple progress shots of what I've been doing. You can see the bench work is done and I'm laying down the sub terrain foam work now. I have some bugs (ha some) to work out like the placement of bridges and the location of the quarry. I want that set before I start cutting the plywood for the below grade quarry.
I'm sure I could go on and drive you all crazy so I'll just post the photo and let you go back to what you are doing.
Dave
I'm sure I could go on and drive you all crazy so I'll just post the photo and let you go back to what you are doing.
Dave