Hi,Here’s something to consider for the real estate challenged…
Ok link may not be linking correctly,
When you say switching, do you mean industrial switching or do you mean making up and breaking down trains in a yard?I have thought about a coffee table layout. But my interest lies in switching and a point to point layout right now. When I can get more space, I’m planning on doing a larger point to point but with the option for continuous running. Starting small.
Yes, that’s true. Have to start small so when it ends up in the dumpster, the next one will be bigger and better!Just assume you'll be wanting a larger layout followed by an even larger one.