westtexjohn
Well-Known Member
I haven't posted lately as I have been busy working in my train room.
Mainly working on west end of layout where my helix is and laying out track to fit.
I have a lower level (staging) a main level and an upper level. Staging and helix are 98% complete but now I have track work around the outside of the helix at main and upper level. I know, clear as mud without a photo.
But track work has worn thin and I am now working on the east end of layout room, finishing the insulation and putting up wall covering.
It looks like I will be getting the upper level operational before the main level as there is much more work to do on the main level.
I'll try to post some photos later. By the end of day I am usually too tired to fidget with downloading a bunch of photos from my camera. That will have to happen on a good morning.
Train sale at Lombards went south when shipping on two sugar cube speakers was $13.95.......not today.
Take care....John
Mainly working on west end of layout where my helix is and laying out track to fit.
I have a lower level (staging) a main level and an upper level. Staging and helix are 98% complete but now I have track work around the outside of the helix at main and upper level. I know, clear as mud without a photo.
But track work has worn thin and I am now working on the east end of layout room, finishing the insulation and putting up wall covering.
It looks like I will be getting the upper level operational before the main level as there is much more work to do on the main level.
I'll try to post some photos later. By the end of day I am usually too tired to fidget with downloading a bunch of photos from my camera. That will have to happen on a good morning.
Train sale at Lombards went south when shipping on two sugar cube speakers was $13.95.......not today.
Take care....John
