Good Afternoon, from a place that can't decide if it wants summer to be here, or just forget about the extra effort and keep it cold.
51F at 1:00pm.
Louis - Another belated Happy Birthday. I don't know why adults celebrate birthdays. What's so darn happy about getting older?!!
I'm going to change-out the kitchen sink taps today. Sick and tired of trying to find a replacement ceramic cartridge for the old Peerless tap. They don't even list it on the Peerless website, and the place I bought the tap dosen't support what they sell. What happened to the good ol' days when it was just an O-ring.
This morning, I was busy bringing my layout track to the area that it will need to cross a bridge. So, I'll need to get busy modelling a bridge, a canyon, and putting in some water. - Still don't have it set in my head how I want it to look, so I suppose I'll build the bridge first. Then worry about what it's going to cross over.
I think I'm doing ok with the track laying. One small error today, in that I have a slight space where a curved switch meets the mainline. Don't believe it will be much of a problem; it just bugs me. Here's a photo:
And here's some pics of the layout as it sit's today.
I removed one switch from the yard out front, to give me more room for a coal trestle. Coal trestles need room for trucks to maneuver. There's a 36" length of track just sitting on a riser diagram, where the trestle will be built.
I'd get to laying track on the other side, but I'm still not quite sure what I want to do. So, that's in 'thinking it out' mode.
The blue markers over in the corner are where a shell heating oil distributor will be. The markers are for tanks, loading dock, and office building.
Here's photos:
This part is about 12' across. It's getting harder to get everything into the photo.
Better go do that sink. Have a good one!