Good evening from the new place. 1st night of sleeping here starts in about 2 hours. Some art work was hung today as the SIL and I did as we were told and didn’t discuss the choices or placement. We just put them up. This place is bigger so I am afraid it’s back to all the craft/art shows on Saturday and Sundays. We can’t have gaps you know. What we have agreed on is no more metal art. Unless I find something more (dragon or dinosaur) for the yard!
There is 140’ of layout framework installed in the train room. It was built and installed a couple weeks ago by the daughter and her best friend.
I know how I want the framework to go around the room. Basically cantilevered around the walls with no peninsulas! Well, that may change as you’ll see from the drawing below. The graph paper squares each equal 4‘ but none of the framework will be a greater depth than 30” with most at or under 24”. Even though it’s drawn as 48” it won’t be! No trackage will be further then 24” from the front edge of the layout.
There will be a couple cold storage warehouses, regular warehouses in a small City setting. Of course a paper mill based on the mills at Rothschild and Mosinee, Wi. (but smaller then the previous mill I had) The combined pulp storage and wood chip yard, similar to the now goneeWausau Paper Mill in Brokaw, Wi. The transload yard and the ethanol load out (but no visible plant) will be free lanced. There will be a dedicated 3 track yard for the paper mill and lots of facade only abandoned buildings along the tracks. There will be a hint of a coal fired power generating station similar to the Weston Generating Station in Weston, Wi. I am thinking about just the building where the coal is dumped and maybe a coal pile. There will be a large grain/flour mill complex, similar to what is in Mt.Pleasant, Wisconsin.
My shop and train room bathroom will be accessible 2 ways, #1 being via a walk around the layout. The layout will not be cantilevered from the wall in this area but sit 4’ from the wall. This is where my thinking has changed. The other entry into the shop or bathroom is via duck under/swing up.
There will be a lower deck for staging only. I do not need to fill the room and really don’t plan to. I doubt there will be a second deck even though my local group strongly is recommending it. The plan is simple, staging to staging. The original idea was to have a mainline around 220 to 250’ maximum. Again that as you can see in the drawing it will be greater. The plan is to have 3-5 operators on the main. A couple run through (unit) trains and 2-3 locals. Still a thought process wrestling with this. One of the guys is turning the plan into something on the computer that will allow me to run trains to see how things go!
Here’s the drawing, the walls in red cannot be moved or breached except by the bathroom door that is on the wall by the shop entrance
View attachment 172586