Running Bear's April 2023 Coffee Shop

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


Status
Not open for further replies.
David - Dang! Does it ever stop raining in your part of the world???

I was going to say 'Yes', but it is coming down like 'stairrods' now. Fortunately I have returned with my younger granddaughter who has been away on 'Weekend Camp'. We missed the rain on the journey here. Now I have to take her home.

At least I do not have to 'wash the car'. 🤣

David
 
I started clearing out the detritius under the old layout today. The plan is to deconstruct today.

Later, I realized I can do the planned layout in stages, so I don't run afoul of SWMBO all at once. Peninsulas C and B can be built, with the 2nd level as primary expanson. Then into Peninsula A and 2nd level over it as expansion is needed. I see at least one side of A as a staging yard, so the planned order may change. Thoughts? Better to build up first, or wide first?

Wife is still testing positive for Coof-19. And she's grumpy about it. I'm still hibernating in the basement since I need to drive Mom to a couple of Dr appointments (Thurs, and the following Tues).

It's a midwest chilly 40°f. But I need to get some steps in.
 
Good morning all.

Happy Sunday. It's a cloudy cool day in Northern Illinois. Going up to only 43 degrees.

Since it was cold, rainy, and snowy yesterday, and couldn't do anything outside. I took my daughter on a ride to a town that was about 20 minutes away. They have an authentic Root beer stand. She got the whole experience of pulling up in the slot, ordering through the speaker, and having the waitress come out with a tray. She was thrilled with the homemade root beer in the frosted mug.

Have a safe day all!
 


I always pronounced it "Coaster".

that’s more like what the original would be, back in the home country.

when you see an oe or ae or ue in a name it is usually a German name. oe = ö, ae = ä, and ue = (drumroll please) ü.

All of these have the long vowel sound of the letter shown first but with the lips rounded like you’re saying a “u” sound, which results in a slightly different effect than just plain long sound but to an untrained ear they sound close.
 
Good Morning All!

38F @ 70% with partly

Wife and I both decided to take a break from the burning. We are both sore. Ya, I know - go do it again to get rid of that. Oh well.

So it looks like puttering around is in store. Don't know what puttering yet though. She does want to go and hoe out some of the stumps that we have left after taking the tree(s) down. She will have fun with that. She is getting pretty good with the bucket so a matter of time and she will get the hoe down. I went out and whacked a couple with the Collins Axe and think that they will push over .. kinda. We will see.

Took the tractor down for fuel yesterday. $17.60 to fill it ( 5 Gals of red dye diesel ) and it looks to hold 7ish. Runs for about 15 hours on 5 Gals. Love living here, cars/trucks would stop and wait for me to get across whatever street and gave me a wide berth. I can just imagine the front bucket or backhoe would do some serious damage to any vehicle.

'get the hoe down'? - geesh

Later
 
I was going to say 'Yes', but it is coming down like 'stairrods' now. Fortunately I have returned with my younger granddaughter who has been away on 'Weekend Camp'. We missed the rain on the journey here. Now I have to take her home.

At least I do not have to 'wash the car'. 🤣

David

around here you sometimes do have to wash the car after a rain. (Lots of dust blows in the wind when it’s been dry, which is most of the time — though not always this noticeably bad though I’ve seen worse)

0922BD0F-06A8-4CF1-B6D4-9FD4E520C8E1.jpeg
 
that’s more like what the original would be, back in the home country.

when you see an oe or ae or ue in a name it is usually a German name. oe = ö, ae = ä, and ue = (drumroll please) ü.

All of these have the long vowel sound of the letter shown first but with the lips rounded like you’re saying a “u” sound, which results in a slightly different effect than just plain long sound but to an untrained ear they sound close.
When we visited MR bout 4 years ago, Coaster is how they pronounced it. Got to talk to him while there, and a few others I had only read about too. Great bunch of people. Think that we spent about 3 hours visiting with everybody; looking at all the current ( and previous ) projects too.

Later
 
Took the tractor down for fuel yesterday. $17.60 to fill it ( 5 Gals of red dye diesel ) and it looks to hold 7ish. Runs for about 15 hours on 5 Gals. Love living here, cars/trucks would stop and wait for me to get across whatever street and gave me a wide berth. I can just imagine the front bucket or backhoe would do some serious damage to any vehicle.
Obviously you live close enough to town to get away with that. My neighbor hauls a couple of 55 gal drums to town in one of his pickup trucks. He has three pickups and the fuel drums rarely get taken out. His fourth truck is a an F-350 converted into a flatbed, which he and his son did themselves. The bed was mounted on some spare axle and is now a trailer.
 
Obviously you live close enough to town to get away with that. My neighbor hauls a couple of 55 gal drums to town in one of his pickup trucks. He has three pickups and the fuel drums rarely get taken out. His fourth truck is a an F-350 converted into a flatbed, which he and his son did themselves. The bed was mounted on some spare axle and is now a trailer.
Willie: Ya, only about 1.5 Miles for fuel. Thing does 35Mph. Have been looking for an 'extra' bed just for trailer. Also looking at those tanks you can put in the box for fuel although those hold more that I would probably ever use in one season. Maybe some day it will be done, maybe not as we don't have THAT much stuff to haul; except for our spring dump run but then the pickup will work just fine; abet multiple trips.
 


Demo has begun. Started on the easy end.

342212591_6416869741696468_4551838856990064133_n.jpg


Dang... Now I have to figure out if I want to just go with the Foam on fiberboard/OSB or whatever it is. I'd rather trust Woodland Scenic risers than my own engineering to get the risers at the correct incline, so I suspect that's where I'll be again.
 
Afternoon All,

Started out with my daily chores then lightly spray panted 10 sage wood trees, after they dried I added a base coat of foliage and then a couple of leafy coats. I figured I would start with the easy ones first. The next group I have to glue branches on before adding foliage. I may be acting as chauffeur for MOH tomorrow.

Christian- Very sneaky. I like it.

Tony- I was under the impression that N scale engines were less powerful (false I guess) than HO engines.

Troy- That is very close to what I have. My recommendation is in the back of the isle between B & C to take out the indentation to the right. The pro of this is it will be easier to get a good radius for the track in that section. The con is it will be harder to do scenery in that corner.

Willie- I pronounced it the same way.

Joe- I look forward to seeing your builds.

20230423_131243.jpg

I hope everyone has a good night.
 
Good Morning All!

38F @ 70% with partly

Wife and I both decided to take a break from the burning. We are both sore. Ya, I know - go do it again to get rid of that. Oh well.

So it looks like puttering around is in store. Don't know what puttering yet though. She does want to go and hoe out some of the stumps that we have left after taking the tree(s) down. She will have fun with that. She is getting pretty good with the bucket so a matter of time and she will get the hoe down. I went out and whacked a couple with the Collins Axe and think that they will push over .. kinda. We will see.

Took the tractor down for fuel yesterday. $17.60 to fill it ( 5 Gals of red dye diesel ) and it looks to hold 7ish. Runs for about 15 hours on 5 Gals. Love living here, cars/trucks would stop and wait for me to get across whatever street and gave me a wide berth. I can just imagine the front bucket or backhoe would do some serious damage to any vehicle.

'get the hoe down'? - geesh

Later
I filled a 20 litre jerry can with notmaldiesel 36.20 red diesel is now really hard to get hold of and I needed it over the weekend, almost choked on the price
 
How it started:
Screen Shot 2023-04-23 at 3.33.36 PM.png


Four bags of trash later... and I'm trying to save as much foam as possible... Saved most of the risers. But...

Here's where I stopped:

342976821_1158868151476973_5590421514316575674_n.jpg

Trash bin is full. Generated 3 tall-kitchen sized bags, and one regular garbage bin bag. Our rolling bin is full for tomorrow's pick up.

The worst casualties were two turnouts. And two of the plaster tunnel portals from Woodland Scenic. The portals are repairable. Even soaking the sculptamold holding them in place with 99%IPA only went so far. Oh well.
 
Impressive start to the season. AL East is the dominant division in the AL. Last I looked, the O's were 4½ game out of first. Hope they can continue the pace. They continue to maintain a ½ game lead over the Yankees, as well as holding on the First AL Wild Card slot. Wow!
It surely has been an impressive start!

Today's game was exciting!

Tigers' starter Eduardo Rodriguez pitched 6.2 perfect innings before giving up a single to Ryan Mountcastle.

Orioles starter Grayson Rodriguez pitched 5 scoreless innings.

Grayson and the bullpen were backed up by several great defensive plays.

The Tigers took a one run lead in the 8th on Spencer Torkelson sacrifice fly.

The Orioles tied the game in the bottom of the 8th on Anthony Santander's pinch hit double.

The Orioles walked it off as Fraizer scored on a wild pitch in the bottom of the 10th.

Orioles 2 Tigers 1

The Orioles sweep the three games series with the Tigers!

The Orioles have won their last 4 series.

It was the Orioles first series sweep of the Tigers since 2004.

1682282633972.png
 
I posted this in the EMD TR5A build thread. It probably belongs here....I guess. Maybe under layout builds/design.........oh well.

In regards to "percent of grade".
Most may know this but this info is for those that do not.
Lets start with a 2% slope. Correctly shown as 2.00%. Now, move the decimal point to the left 2 digits. Now we have 0.02000.
0.0200 is now the tangent of an angle .
Most handheld calculators have Sin Cos Tan functions. Most also have a button to achieve the inverse functions usually referred to as arc-sin, arc-cos and arc-tan.
Back to our 0.02000 number. Enter this number in your calculator do the arc tan function and you should now have 1.1458. This is the angle in decimal form as 1.1458 degrees which equates to 1 degree, 8 minutes and 45 seconds.
This angle may be a bit hard to set up on your layout so lets do something else.
That tangent number, 0.02000 is the tool to use for figuring the slope dimensions on your layout.
Take 0.0200 and multiply by 12 (number of inches in a foot) and we get 0.2400.
12 inches represents the base of a right triangle (horizontal length) times the tangent gives the rise, the 0.2400 number. 0.2400 equates to 3.84 sixteenths of an inch. You can round this up to 1/4 (4/16ths) inch rise in 12 inches of horizontal length. But using this rounded up number will accumulate as you add more 12 inch lengths. So........
For more accuracy lets take an even rise number like 1 inch. To achieve 1 inch rise at 2% slope you need 50 inches of horizontal length.
So now 12 1/2 inches gives us 1/4 inch of rise exactly ; 25 inches gives us 1/2 inch rise ; 37 1/2 inches gives us 3/4 inch rise.
To sum up: 1% slope use .01000 as a tangent
1.5% slope use .01500 as a tangent and so on.

If you have a sloping section on your layout and you want to know the percent of slope (grade) of that section of track, then set up a level, lets say a 3 foot level. Set one end of the level on the high end of the track (roadbed, etc) and while keeping it level, measure the distance between the top of the track (roadbed etc) to the bottom of the level. Lets say you measured 3/8 of an inch.
Now 3/8 of an inch equates to .375 decimal and your 3 foot level converts to 36.00 inches. (we have converted all numbers to decimal inches)
Dividing .375 by 36 will give you 0.0104. That 0.0104 number is the tangent of the angle so move the decimal point 2 digits to the right and now you have 1.04. This is 1.04 % of grade. Not bad.

I hope this helps and is not confusilating to you. It is just trigonometry. o_O🥱
There may be a better way but this is what I use.

Take care....John
 
I posted this in the EMD TR5A build thread. It probably belongs here....I guess. Maybe under layout builds/design.........oh well.

In regards to "percent of grade".
Most may know this but this info is for those that do not.
Lets start with a 2% slope. Correctly shown as 2.00%. Now, move the decimal point to the left 2 digits. Now we have 0.02000.
0.0200 is now the tangent of an angle .
Most handheld calculators have Sin Cos Tan functions. Most also have a button to achieve the inverse functions usually referred to as arc-sin, arc-cos and arc-tan.
Back to our 0.02000 number. Enter this number in your calculator do the arc tan function and you should now have 1.1458. This is the angle in decimal form as 1.1458 degrees which equates to 1 degree, 8 minutes and 45 seconds.
This angle may be a bit hard to set up on your layout so lets do something else.
That tangent number, 0.02000 is the tool to use for figuring the slope dimensions on your layout.
Take 0.0200 and multiply by 12 (number of inches in a foot) and we get 0.2400.
12 inches represents the base of a right triangle (horizontal length) times the tangent gives the rise, the 0.2400 number. 0.2400 equates to 3.84 sixteenths of an inch. You can round this up to 1/4 (4/16ths) inch rise in 12 inches of horizontal length. But using this rounded up number will accumulate as you add more 12 inch lengths. So........
For more accuracy lets take an even rise number like 1 inch. To achieve 1 inch rise at 2% slope you need 50 inches of horizontal length.
So now 12 1/2 inches gives us 1/4 inch of rise exactly ; 25 inches gives us 1/2 inch rise ; 37 1/2 inches gives us 3/4 inch rise.
To sum up: 1% slope use .01000 as a tangent
1.5% slope use .01500 as a tangent and so on.

If you have a sloping section on your layout and you want to know the percent of slope (grade) of that section of track, then set up a level, lets say a 3 foot level. Set one end of the level on the high end of the track (roadbed, etc) and while keeping it level, measure the distance between the top of the track (roadbed etc) to the bottom of the level. Lets say you measured 3/8 of an inch.
Now 3/8 of an inch equates to .375 decimal and your 3 foot level converts to 36.00 inches. (we have converted all numbers to decimal inches)
Dividing .375 by 36 will give you 0.0104. That 0.0104 number is the tangent of the angle so move the decimal point 2 digits to the right and now you have 1.04. This is 1.04 % of grade. Not bad.

I hope this helps and is not confusilating to you. It is just trigonometry. o_O🥱
There may be a better way but this is what I use.

Take care....John
John I rather you calculate the forces of the cars pushing down on each other when descending the grade. That's the problem I had with a 3% grade. Cars derailing going down the grade. I thought about having a helper engine on the rear as a brake but realized the better option would be to lower the grade to 1.5 percent.
Swal
 
I posted this in the EMD TR5A build thread. It probably belongs here....I guess. Maybe under layout builds/design.........oh well.

In regards to "percent of grade".
Most may know this but this info is for those that do not.
Lets start with a 2% slope. Correctly shown as 2.00%. Now, move the decimal point to the left 2 digits. Now we have 0.02000.
0.0200 is now the tangent of an angle .
Most handheld calculators have Sin Cos Tan functions. Most also have a button to achieve the inverse functions usually referred to as arc-sin, arc-cos and arc-tan.
Back to our 0.02000 number. Enter this number in your calculator do the arc tan function and you should now have 1.1458. This is the angle in decimal form as 1.1458 degrees which equates to 1 degree, 8 minutes and 45 seconds.
This angle may be a bit hard to set up on your layout so lets do something else.
That tangent number, 0.02000 is the tool to use for figuring the slope dimensions on your layout.
Take 0.0200 and multiply by 12 (number of inches in a foot) and we get 0.2400.
12 inches represents the base of a right triangle (horizontal length) times the tangent gives the rise, the 0.2400 number. 0.2400 equates to 3.84 sixteenths of an inch. You can round this up to 1/4 (4/16ths) inch rise in 12 inches of horizontal length. But using this rounded up number will accumulate as you add more 12 inch lengths. So........
For more accuracy lets take an even rise number like 1 inch. To achieve 1 inch rise at 2% slope you need 50 inches of horizontal length.
So now 12 1/2 inches gives us 1/4 inch of rise exactly ; 25 inches gives us 1/2 inch rise ; 37 1/2 inches gives us 3/4 inch rise.
To sum up: 1% slope use .01000 as a tangent
1.5% slope use .01500 as a tangent and so on.

If you have a sloping section on your layout and you want to know the percent of slope (grade) of that section of track, then set up a level, lets say a 3 foot level. Set one end of the level on the high end of the track (roadbed, etc) and while keeping it level, measure the distance between the top of the track (roadbed etc) to the bottom of the level. Lets say you measured 3/8 of an inch.
Now 3/8 of an inch equates to .375 decimal and your 3 foot level converts to 36.00 inches. (we have converted all numbers to decimal inches)
Dividing .375 by 36 will give you 0.0104. That 0.0104 number is the tangent of the angle so move the decimal point 2 digits to the right and now you have 1.04. This is 1.04 % of grade. Not bad.

I hope this helps and is not confusilating to you. It is just trigonometry. o_O🥱
There may be a better way but this is what I use.

Take care....John
Did you just sneak math into the coffee shop?

Did you even bring in donuts? I mean if you're going to drip MATH all over the place... :eek: Donuts woulda helped. :cool::p

Not to pop your enthusiasm for Trig.... But every time I run into any equations beyond how to slice a pie so I get a piece, my eyes glaze over. I find myself knotting the corners of a handkerchief, grabbing my fair island sweater vest and suspenders, a pair of Wellies, and begin mumbling about how my brain hurts.

Screen Shot 2023-04-23 at 6.43.20 PM.png
 
Sometimes being old is just painful!
My daughter had her carpet replaced last week and I grabbed some of the used carpet to use on the basement stairs and attic stairs.
Yesterday, I measured several pieces and found two pieces to cut for both landings. Cardboard on the basement concrete floor, large carpet piece and a foam pad still felt like bare knees on the floor. Measuring, cutting and nailing down those two pieces of carpet was all I could manage to do for one day.
Being a glutton for punishment, I measured and cut 42" x 11" strips for 15 of the steps. I will nail those pieces in tomorrow and try to let my knees heal for a few days before I cut the other 12 step carpets.
Then, maybe I can get back to working on the layout.
 


Status
Not open for further replies.




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top