pcarrell
Just a guy
Got the bridge to sit in place and mocked up the track curves to it. Looks to be promising, I plan on semi-permanently laying the curves down tonight to actually test my big locos across it. If it works I'll make the curves permament then I plan on finishing up my roller drawer for hiding my zephyr controller when not in use.
This sounds interesting. If it works out, how about a pic?
