Personally I'd go with the ST&D cars not the Walthers cars.RT - Where ya been? Don't be such a stranger!
Ray - Great idea (about making a card), wish I'd saved a larger copy. Oh well, seeing this year after year kinda makes me think inside the box too much...
KenM - Hope those people have the cash to buy your house
Rex - Here's a copy of the steel mill track plan from my old house, where space was at a premium. I think you could leave your blast furnace and coke ovens where they are, and setup a half-dozen rolling mill buildings on the peninsula. Prototype steel companies often ran their hot metal cars and slag pots on the main line, you could do that too (just add spacer cars + caboose). Peach Creek has hot metal cars/slag cars in stock if you don't already have any. Also copies of Dean Freytag's original steel modeling book (a must-read for guys like us!)
Good morning all, finished my final paper for class. Now I have more time to devote to figuring out my layout. Thanks to everyone who has taken the time to give advice and drawings. Hopefully I can get a layout figured out soon and get to start in.
Nick
Rex - Here's a copy of the steel mill track plan from my old house, where space was at a premium. I think you could leave your blast furnace and coke ovens where they are, and setup a half-dozen rolling mill buildings on the peninsula. Prototype steel companies often ran their hot metal cars and slag pots on the main line, you could do that too (just add spacer cars + caboose). Peach Creek has hot metal cars/slag cars in stock if you don't already have any. Also copies of Dean Freytag's original steel modeling book (a must-read for guys like us!)
Well, I have done it again. I found some extra land in the Depot and just have to fill it up. There has to be a cure for this...maybe a model railroaders crisis group.
This started out being a 12ft. extension for the town of Newton. Hmmmm! Right in the middle of the construction and with only 8ft up (as the photo shows), an idea popped to mind. Now if I were to move the steel mill complex to the new extension, I would free up the more sceniced area for the town with light industry (see the sickness). This means removal of about 10 sidings, ballast, roadbed, structures, reversing loop, and etc. The steel complex is the first area I worked on when I started the layout. I have never been too happy with it being next to the mountains, but at the time, the layout was only going to use half of the garage. (That thought only lasted 1.5 years)
EDIT: KENL, help! Come on down for some fun and show me some Steelmill expertise.![]()
With all the loose ends around the layout and I have to think of something else to do. No wonder a layout is never done
.
[
NICKB: Congratulations on finishing your final paper. Is that it or do you have more to do? You're working on your EE, right?
QUOTE]
Actually already have my engineering degree working on my Masters in management part time and I finished my class for the semester. Since it's part-time the class is designed to be shorter but higher intensity in workload, and thanks.![]()
Thanks Jos, I was very happy to get my Bachelors now starts the long road for my Masters due to I'm working full time now as an engineer and only have evenings for my master's classes.
