Well, I have done it again. I found some extra land in the Depot and just have to fill it up. There has to be a cure for this...maybe a model railroaders crisis group

.
This started out being a 12ft. extension for the town of Newton. Hmmmm! Right in the middle of the construction and with only 8ft up (as the photo shows), an idea popped to mind. Now if I were to move the steel mill complex to the new extension, I would free up the more sceniced area for the town with light industry (see the sickness). This means removal of about 10 sidings, ballast, roadbed, structures, reversing loop, and etc. The steel complex is the first area I worked on when I started the layout. I have never been too happy with it being next to the mountains, but at the time, the layout was only going to use half of the garage. (That thought only lasted 1.5 years)
EDIT: KENL, help! Come on down for some fun and show me some Steelmill expertise.
With all the loose ends around the layout and I have to think of something else to do

. No wonder a layout is never done

.