Today's progress on the other viaduct


NYC_George

Well-Known Member
This is the lower level viaduct using the spilt in half Walther’s concrete street bridges. I have to install one more half and then make up the abutments for the I-girder bridge. I already made up the ones for the truss bridge you see in the photo. I still have to add some details to the concrete and later the whole thing gets a swallow water marsh with cattails etc.

NYC_George
 
Thanks Dan I guess spending $53.00 for the three on sale bridges was worth it. There’s a custom shaped piece of 1 X 2 behind the piers that support the track roadbed above . I think the whole scene will look much better when the track is ballasted and the marsh is done.

NYC_George
 
George that's a brilliant use of the bridges, it's gonna look sweet with the marsh!
Keep us posted!
 



Back
Top