So I did it. I finally took the plunge and demolished the old layout.
As of 10:30 pm last night:
as of 2:30 am
and currently, still have some clean up but I was able to save all wood but a 2x4's worth and most track.
so the new layout is still in the planning stages but I think i'm close to starting the construction. I'm off for 18 days at x mas so hopefully i'll get the benchwork done. I think the final plan will be very close to this.
So what do you think of the plan? The tracks in the yard are 1 inch rail to rail, is that to close? So the the tracks at the bottom left go to the mine. The mine's main customer is the power company at the upper right. The other two siding will probably some smaller factories that go to the yard and are sent out to other towns. the other buildings were just stuck there not final position.
As of 10:30 pm last night:
as of 2:30 am
and currently, still have some clean up but I was able to save all wood but a 2x4's worth and most track.
so the new layout is still in the planning stages but I think i'm close to starting the construction. I'm off for 18 days at x mas so hopefully i'll get the benchwork done. I think the final plan will be very close to this.
So what do you think of the plan? The tracks in the yard are 1 inch rail to rail, is that to close? So the the tracks at the bottom left go to the mine. The mine's main customer is the power company at the upper right. The other two siding will probably some smaller factories that go to the yard and are sent out to other towns. the other buildings were just stuck there not final position.