WEEKEND PROGRESS.
I did a small project, that is another milestone: I layed my first Industrial Siding. I've already layed allmy mainline, Yard, and passing siding track, so these are the last to go due to the fect that I have to build the building before I lay the track.
Here's the whole process...
First I test Fit the track, and test my legnth of the siding using 2 40' reefers, the usual traffic for "Valley Citrus Packers"
Then I lay the cork and Track using standard methods...
Finally I was curious wether some of my new Athearn 50' Reefers would fit, so I tested with another 50'' car to make sure it wouldn't foul the switch, and as it turns out, it's perfect!
Hope you liked this little project.
I did a small project, that is another milestone: I layed my first Industrial Siding. I've already layed allmy mainline, Yard, and passing siding track, so these are the last to go due to the fect that I have to build the building before I lay the track.
Here's the whole process...
First I test Fit the track, and test my legnth of the siding using 2 40' reefers, the usual traffic for "Valley Citrus Packers"
Then I lay the cork and Track using standard methods...
Finally I was curious wether some of my new Athearn 50' Reefers would fit, so I tested with another 50'' car to make sure it wouldn't foul the switch, and as it turns out, it's perfect!
Hope you liked this little project.