KB02
Well-Known Member
I spent last weekend in Springfield, MA at the Amherst Model Railway Society's train show. Huge show, lots of people, lots of layouts... it was great. And shockingly enough, I think I spent less than $50!! (what's wrong with me?) MY WIFE actually made the first purchase of the weekend! She saw a Athearn Christmas boxcar with her year of birth. Then she looked at the car right next to it which was an Athearn Christmas boxcar with my year of birth! She couldn't resist the set. 
Anyway, one of the main reasons I wanted to go to the show was to get inspiration for my layout. I've hit a bit of a slump lately and am not quite sure I am happy with what I have. After seeing all the amazing layouts (and even those that were still under construction), my brain keeps telling me it's time to tear down what I have and start over. That would mean a ton of work and additional investment, a complete redesign, rearrangement of the space, begging, borrowing, bartering... relocating the pool table...
And the worst part is: My wife has given her blessing! (GOD, I love her!!!)
The big question is: Is a teardown and rebuild REALLY something I want to do?
If I did it, I was thinking of building a FreeMo style modular layout. That way I could work on one module at a time instead of huge sections. I could redesign with larger radius curves to run bigger/stronger/cooler looking locos. BUT, it may be a while before I could even run any trains. My 5 year old (he turns 6 next month) would be seriously disappointed.
I don't know... What would you do?
Anyway, one of the main reasons I wanted to go to the show was to get inspiration for my layout. I've hit a bit of a slump lately and am not quite sure I am happy with what I have. After seeing all the amazing layouts (and even those that were still under construction), my brain keeps telling me it's time to tear down what I have and start over. That would mean a ton of work and additional investment, a complete redesign, rearrangement of the space, begging, borrowing, bartering... relocating the pool table...
And the worst part is: My wife has given her blessing! (GOD, I love her!!!)
The big question is: Is a teardown and rebuild REALLY something I want to do?
If I did it, I was thinking of building a FreeMo style modular layout. That way I could work on one module at a time instead of huge sections. I could redesign with larger radius curves to run bigger/stronger/cooler looking locos. BUT, it may be a while before I could even run any trains. My 5 year old (he turns 6 next month) would be seriously disappointed.
I don't know... What would you do?