I would suggest that you make, what appears to be 2 crossings, as two overs and unders, as the length of train you can run could be limited to the distance between the two of them on the right hand side otherwise. The wiring of them on the same level might be difficult too. Would add to the scenic value though by having grades leading up to the bridges, instead of all flat.The new track plan with larger curves than the previous one.