Here is part 2 of the series, the Walthers Cornerstone Series Coke Oven & Quencher Plant
Here is a pic of the Walthers Coke Oven from Walthers web site
Step 1
I assembled the "foundation" and the footprint of the layout of the Coke Oven & Quencher Plant
Step 2
I painted the Lower Oven Walls a primer grey and then glued them in place
Step 3
These one's are of the 2 Coal Bunker Supports. I sprayed them a rust color with the brick walls sprayed primer grey.
Step 4
Here is the Outer End Wall for the Lower Coal Bunker Section. It has some access doors. The Brick Wall was also sprayed Primer Grey with the Roll-up Door and Personel Door begin sprayed a lighter grey.
Here is the Lower Coal Bunker Assembly. The Coal Bunker will sit ontop of the supports at the top
Step 5
Glued the Lower Coal Bunker Assembly to the Foundation of the Ovens
Glued the Oven Floor in place. This floor will be very weathered
Step 6
The Coke Oven Walls have been sprayed a rust color while the Brick Oven Walls were sprayed the grey primer color.
Oven Top has been sprayed a tan color and glued in place ontop of the oven walls. The Oven Top will be weathered with bits of brown, black, orange, and red colors and the walls will be weathered the same way.
Step 7
The rest of the Oven Top has been glued in place.
Step 8
Here is the top portion of the Coal Bunker which has been sprayed the rust color. The black part is where it will be sprayed an aluminum color as it is aluminum siding.
Aluminum Siding sprayed.
Added the roofs to the Coal Bunker. The opening is for the conveyor that will come from the Crushing House.
Step 9
Supports for the Stairwell that will come from ground leveel up to the Oven Top.
Step 10
Here is the stairwell that goes from the ground up to the top of the ovens. This is the unpainted pic.
Here is the painted Stairwell. I sprayed it a bright safety yellow which will be weathered to look used.
Step 11
Collector Pipe has been glued to the Ovens top and into the Governor House.
Step 12
Oven Staircase glued in position
Step 13
Governor House has been built and sprayed several diff colors including Rust color for the support structure, Silver for the aluminum sheeting walls, and grey for the door to the Governor House
Governor House Rear. You can see the Collector Pipe going in the Governor House.
Step 14
Governor House Staircase.
Step 15
Smokestack. It has been sprayed grey and will be weathered with brown, black and rust chalks
Step 16
Lower Crusher House Walls. They have been sprayed an aluminum color. That is an access door were the hole is and on the other side is where the conveyor goes out from to go to the top of the Coal Bunker
Step 17
Crusher House. Been sprayed Rust Primer and aluminum on the top just like the Coal Bunker
Step 18
Added the side Roofs to the Crusher House
Step 19
Added the Side Walls for the Conveyor to go in