PRR Modeler
Well-Known Member
Afternoon All,
Started out with some chores then after lunch started back on the track work. Today I got the mainline completed (other than another set of track feeders) and I got one interchange track in. Both have the rail joiners soldered. I figure I'll finish the second interchange track on Sunday since I'm tied up all day Saturday (not literally Sherrel! )
It was more difficult to get the track geometry correct with the T/O's in place on the right side (lesson learned). I had planned to use 2 RH T/O's for the right side ladder but I ended up using a RH and a LH T/O so the geometry would work.
Thank you all for the likes on my photos yesterday.
Sherrel- Nice looking loco.
Joe- Nice pictures.
Willie- It's 40 cents more a gallon here. Great modeling and details.
Guy- Nice pictures. The train room is in our loft or bonus room. Years ago I started with half for trains and slowly took over the room.
Garry- Thank you. I hope you are improving.
I hope everyone has a good night.
Started out with some chores then after lunch started back on the track work. Today I got the mainline completed (other than another set of track feeders) and I got one interchange track in. Both have the rail joiners soldered. I figure I'll finish the second interchange track on Sunday since I'm tied up all day Saturday (not literally Sherrel! )
It was more difficult to get the track geometry correct with the T/O's in place on the right side (lesson learned). I had planned to use 2 RH T/O's for the right side ladder but I ended up using a RH and a LH T/O so the geometry would work.
Thank you all for the likes on my photos yesterday.
Sherrel- Nice looking loco.
Joe- Nice pictures.
Willie- It's 40 cents more a gallon here. Great modeling and details.
Guy- Nice pictures. The train room is in our loft or bonus room. Years ago I started with half for trains and slowly took over the room.
Garry- Thank you. I hope you are improving.
I hope everyone has a good night.