D&J RailRoad
Professor of HO
With the summer outdoor projects demanding attention along with the weekly chores, i.e. cutting the grass, work on the D&J Railroad has slowed down significantly.
With the recent week of rain I was able to put some time into laying more track. No power is applied to the rails yet, but I can run a string of cars on each track to ensure smooth action.
The 2x4s on each side of the road bed are the foundation of a mountain that will cover this section of the track. A tunnel portal will be right about here.
5438
Looking down the track from this perspective will be looking into a tunnel at about this point. The 2x4s are where the end of the tunnel will be. The lower road bed is where this track passes under itself about 40' around the loop.
5442
With the recent week of rain I was able to put some time into laying more track. No power is applied to the rails yet, but I can run a string of cars on each track to ensure smooth action.
The 2x4s on each side of the road bed are the foundation of a mountain that will cover this section of the track. A tunnel portal will be right about here.
5438
Looking down the track from this perspective will be looking into a tunnel at about this point. The 2x4s are where the end of the tunnel will be. The lower road bed is where this track passes under itself about 40' around the loop.
5442
Last edited by a moderator: