In time my friend even your wife will learn to blame me!

Lord know's at time it feels like I'm on the, "Everybody hates Chris!" show....LOL's
OK everyone! Its Chris's fault from now on! No matter what what!
Been real busy around here on the layout. I did a month long clinic on handlaying a turnout at the club last year, and now I'm repeating it here for a couple of clubbers that missed it. I'm teaching them to lay a couple of turnouts that go to two industries, not on the main, so if they mess up, it won't hinder ops here until I get them fixed, if necessary.
My new bundle of code 70 rail arrived so I can get back to finishing the yard. Only got to lay another 10 turnouts and got to gap, and wire in jumpers on my double crossover so it will be operational. Then the entire yard will be operational.
I got 4 locos torn down for stripping and painting. Two for customers and two for me! I also got two Spectrum steamers that need some minor repairs, and just about finished the regearing of a loco for L&NCastle, (William) here on the forums. The gearing is in and has been lapped, so it runs real smooth! I believe he will be quite pleased.
Don't know if I said this before, but all approach tracks to the TT is now in place, and all I gotta do is cut and place the throwbars for the Caboose Industries ground throws. I connected power directly to the TT motor last night and ran the motor until it no longer makes any noise. I believe that there are some "high" spots in the TT pit that tries to hang up the TT bridge, so I get to remove the bridge and file down the bottom girders a bit to relieve that dragging.
Well its 0136 here, and I need to wrap this up. Yall take care, and the folks being threatened up nawth by the severe weather, yall stay safe!