santafewillie
Same Ol' Buzzard
Supervisor Joe trying to figure out how Jack is going to get out of the predicament that he got into.
Plywood is definitely expensive. I'm not sure what it's going for, but have you looked into something like OSB?I’m currently banned from Lowe’s. “Apparently” I over spent last weekend and my accountant was less than pleased. So it looks like not much is going to happen on the railroad this weekend. Haven’t bought any plywood yet. Trying to find a cheaper wood that’s smooth and flat. The stuff I want is running between $45 and $48 a sheet. *sigh*
First world problems.![]()
I violated my parole today. This chunk was shorten to 8 foot long. It didn’t look right. I decided to go with the original 12 foot long. I like it. Finally, all the benchwork is done. Now I’ll ask for forgiveness.View attachment 213699
It is bigger than my layoutJust got a Big Boy!
It is one of the original Genesis that came with the MRC decoder, however it has been upgraded to a Soundtraxx Tsunami
Someone might have to get their hands dirty, that would be the quickest waySupervisor Joe trying to figure out how Jack is going to get out of the predicament that he got into.
View attachment 213640
That looks amazing!The Schwarzburg Bahnhof is nearing completion. This is a trial fit trackside, there is still much detail work to finish. The lighting is installed and working.
View attachment 214876
