T
TrucTrain55
Guest
Looks good Dave thanks for sharing.I am waiting for a new bag of hydrocal, so did a bunch of "piddly" stiff on the layout; stuff that has to get done but is barely noticable:
From Groningen to the bridge, I got all the spacer ties in place and glued down (between the flex track pieces), got all the track tacked in place and lined up properly that you can see here and tacked down
View attachment 209305
I actually got a box car out and checked out my track a little, this part is also nailed down and ready for paint and ballast:
View attachment 209306
Also got the bridge track cut to the right length and put down a little base ballast (filled in some spaces with glue and sand)
View attachment 209307
This track will be painted and ballasted. I had some gaps where the grade dropped down going into Grantsburg.
Dave LASM


