brubakes
Member
Some shots of the progress on the T&GP machine shop. Started installing everything in the building this afternoon. Glad that I have been saving metal shavings/filings for a couple of weeks as there is lots of spots for them. Before any of the details were added the interior floor and lower walls were gone over with weathering powders.
Matt Dillow
MD Custom Models
The pin up girl on the wall is a nice touch.

