DairyStateDad
Mumbling in the corner
I'll try to keep this short although it took me the better part of yesterday afternoon just to work out the idea.
For several of my grades I plan to use the Woodland Scenics foam inclines. I bought starter sets for 2, 3, and 4% back just after Christmas. I expect to use the 2% mostly, maybe some of the 3%. If I can I will just use the starter sets, elevating them on pieces of cut foam when the elevations are higher.
But I'm trying to set up each beginning grade so that there's a foot of 1% before going to the 2% to create a vertical easement. So for that first foot the track rises just 1/8 of an inch.
I just don't have a steady enough hand to try to cut a 1/8-inch by 1 foot wedge out of the insulation foam I have. And cookie-cutter benchwork isn't an option for me.**
After a lot of mulling this over, I have come up with a way to create the 1% grade for that first foot. Originally I was going to use styrene but decided instead to use chipboard or posterboard. I would build up the grade with layers of posterboard/chipboard. The top layer would be the full length of the run (1 foot), and each successive lower level would be somewhat shorter. Like this:

How many layers would depend on the thickness of the posterboard or chipboard. For 0.012 inch thick posterboard, I would need about 10 layers (+/-). I'd then start the WS incline at that point (cutting off start of the incline so that the new starting point matches the 1/8-inch height of the 1% segment I've made). I suppose I would use plaster or something like that to smooth the transition (Suggestions for specific products to use?) between the 1% segment and the 2% incline.
Cork roadbed would go on top of all of this, of course.
One thing I like about this idea is that it can be as wide or as narrow as I need depending on the number of parallel tracks being elevated.
I have worried a bit about whether moisture would affect the posterboard or chipboard. Right now, I'm figuring it won't be a serious issue, becuase it's a fairly small segment, and it will be covered over (foam on the bottom, cork on the top). I guess if it seems like a problem I could spray the whole thing with some kind of lacquer for paper before installing it.
So, what do you think -- is this going to work OK? Do you see pitfalls that I should watch out for? Is there another option that is easier?
**(Aside--one thing I would do differently if starting now is, instead of putting down a single sheet of 2-inch foam on the layout top, put down a sheet of 1-inch foam, then top it with another sheet of 1-inch-foam, which would be just tacked lightly at the corners; the upper layer would then be used to construct the cook-cutter roadbed. But that's water under the bridge now.)
For several of my grades I plan to use the Woodland Scenics foam inclines. I bought starter sets for 2, 3, and 4% back just after Christmas. I expect to use the 2% mostly, maybe some of the 3%. If I can I will just use the starter sets, elevating them on pieces of cut foam when the elevations are higher.
But I'm trying to set up each beginning grade so that there's a foot of 1% before going to the 2% to create a vertical easement. So for that first foot the track rises just 1/8 of an inch.
I just don't have a steady enough hand to try to cut a 1/8-inch by 1 foot wedge out of the insulation foam I have. And cookie-cutter benchwork isn't an option for me.**
After a lot of mulling this over, I have come up with a way to create the 1% grade for that first foot. Originally I was going to use styrene but decided instead to use chipboard or posterboard. I would build up the grade with layers of posterboard/chipboard. The top layer would be the full length of the run (1 foot), and each successive lower level would be somewhat shorter. Like this:

How many layers would depend on the thickness of the posterboard or chipboard. For 0.012 inch thick posterboard, I would need about 10 layers (+/-). I'd then start the WS incline at that point (cutting off start of the incline so that the new starting point matches the 1/8-inch height of the 1% segment I've made). I suppose I would use plaster or something like that to smooth the transition (Suggestions for specific products to use?) between the 1% segment and the 2% incline.
Cork roadbed would go on top of all of this, of course.
One thing I like about this idea is that it can be as wide or as narrow as I need depending on the number of parallel tracks being elevated.
I have worried a bit about whether moisture would affect the posterboard or chipboard. Right now, I'm figuring it won't be a serious issue, becuase it's a fairly small segment, and it will be covered over (foam on the bottom, cork on the top). I guess if it seems like a problem I could spray the whole thing with some kind of lacquer for paper before installing it.
So, what do you think -- is this going to work OK? Do you see pitfalls that I should watch out for? Is there another option that is easier?
**(Aside--one thing I would do differently if starting now is, instead of putting down a single sheet of 2-inch foam on the layout top, put down a sheet of 1-inch foam, then top it with another sheet of 1-inch-foam, which would be just tacked lightly at the corners; the upper layer would then be used to construct the cook-cutter roadbed. But that's water under the bridge now.)

