small space, multi level

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


So, been absent a while. But not idle. I have just been learning track work, and why things don't run like they are supposed to . Not saying I have it all figured out yet. But still learning. Anyway. Now that I have been looking at layout designs, and trying to figure out what I want to do. I was always just thinking one level. But seeing pics and vids of multi level layout, my head was going to explode. I know I can not do what I want due to space issues. So I am looking for expert advice. I have roughly 36x72inches. I can go a bit bigger. And I thought I had it figured out, until I realized with only 3 inches of space between level 1 and 2, that just gave no room to work for when accidents happen. So. Do you think it is even possible to have 2 levels on a layout this size? The second level obviously not as big. Maximum 20x36, and even some of that is cut away. And I am talking about moving the train from bottom level to top level. Not 2 independent trains. My only other option I think if I wanted a multi level, would be to run a narrow bottom, with more length, and and narrow top layer. Probably have to run a helix then, I I have no idea about that. Anyway. For now, I am looking at my 36x72 ish. Tell me its impossible if you must. N gauge.
 
1. Keep it simple. Less is more.
2.You really don't have room for a helix even in N scale . It will take up too much real estate.
3.Unless you have extremely long arms 36" is too deep. 30" is pushing it.

You can build a 4 industry N scale switching layout in 24"x72" easily. 4 multi car industries will keep your interest. Use #6 switches and you will probably only need 4-6 at the most.

My HO layout is 2'x13', with 4 multi car industries, and only 4 switches.
 






Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top