Chad: Soon be able to start framing and getting it enclosed. Hopefully before snow starts.
Me too
I am hoping the framers can show up end of the week to start their prep. They are only framing, to start, the basement situated bearing walls and the floor joists and subfloor for the main floor. Then we start placing more foam. The foam/concrete walls go all the way to the roof, which is vaulted, and made from beams and joists (not trusses).
I'd like to get the outer structure and the roof on this year. (It is a stretch but if I can get people constantly working on it we can make it. I have a crew ready to help me put the foam up and hopefully the next level is 2 weeks worth of work (mostly full time). It is much simpler with fewer walls, less steel, less rebar, and we have already made all the screw-ups and solved all the problems and are now experienced