Well, howdy there internet peeps and those resting comfortably at home after your journeys.
It's Troy again.
Got a lot accomplished yesterday, but there are piles of detritus: mostly gaming relating stuff I had stored under the model railroad. I have less model railroad, so less storage space. That means being more organized in storing the detritus.
No pics due to the detritus in the way. However, the basement is shaping up nicely with more floor space.
My resistance bands came in yesterday. I have the hooks to attach them to the wall, but I also need some hooks to store them.
Heading out to the Menards (big box) this morning. I decided to add some sheets of 1/4inch birch ply under the foam. That way I can mount tortoise motors underneath easier than with bare foam. And, that should give me a firmer surface to mount the foam to than 1x "studs"
I debated with a 2x4 peninsula off the North leg, but that is "tabled" for now.
On tap for today is bolting the former far left section to the still-right section. Then moving some more detritus off the far far right peninsula so I can remove the foam board and tackle removing the excess bolt-ons (we're going back to au-natural version of the 2 ft deep. The only time it won't be is curving the corners.
OK, you talked me into it: Here's a pic
It's 10 feet from the corner to the end of the East Leg (in the background) and 11 ft 5 in from corner along the North leg. The East leg will have a L of 2ft at it's end to add the harbour at Port Burwell. The benchwork is already there, I just need to remove the extras I bolted on to make that wide section.