Well, howdy there internet peeps and thos drooling over Bill's donuts
It's Troy again.
Currently 71 and 98% humidity.
Florida needs to come up here and get it's weather. It seems to be drunk and took a road trip.
I'm waiting on the manuscript to come back from the editor. Not much I want to do with that book hanging over me, so I may be glueing down foam to make the elevated portions of the layout.
reading Lance Mindheim's work, and realizing I have a "twice around" layout (a continuous loop, I want some way to seperate the main line's "going out" run from its "return" run.
First thought was to elevate the run along the backdrop an inch or so, and hide portions behind building for the foreground scenes. but then I realized that I can have the mainline in the foreground start at elevation zero, and make the background run the scenic town line by having a 2% grade up 1 inch at either end.
The W shaped layout would have the main chug along the countryside, hugging the front of the layout, with perhaps one siding.
It's first real siding would be at the Abbey.
Leaving the Abbey, It would wind around the WEST peninsula, and climb an inch to +1 zone. This would then have scenic towns at:
The college...
Goshen Main St.
The asylum (zombies be here) - no siding there, we just zip on by the zombies
Then around the back edge of the East peninsula, descending an 1inch for the military encampment and containment zone HQ.
I just need to get the kraft paper out and draw in the track plan to make sure I have decent curves, and room for the buildings.
Right now I have just enough WS foam incline risers to do the four 1/2 inch rise in 2ft that I need to add and subtract an inch on each end. I'm really tempted to add two more sidings from the front of the main, but I keep fighting that. One more may be needed, however. I've got a blank spot on the center peninsula that needs something. Logging camp? Farm scene?
And, Last night was the train club meeting down at the Public Library.
Someone realized the annual May elections didn't happen as scheduled. communication with this group isn't the best. they let you know about shows, but not much else. Also, there wasn't a quorum at the May meeting. But there was tonight.
Since I had just paid my membership dues, I suggested a motion to re-elect officers if no-one else was nominated for a post. The officers present were unchallenged, so motion was passed.
Something tells me I'll be on the communications side of that equation soon. Clubs die when there isn't a good means of communication. And relying on only one person (the prez in this case) to email reminders is where it usually breaks down.