Hi guys, small update.
Got threatened by one of the coworkers this morning, only 2 hours into my shift, said I needed to "Get the F _ _ _ out of here or I will beat the crap out of you"
I guess I didn't really need the job that bad.
I did get a couple of more photos however,
Here is a close up of the unload end of the machine, it took it about 10 minutes to unload a semi:
This is our work area, the asphalt area below:
This is an adjacent area. On this spur it was dry mix for concrete:
Check out the "end of track mechanism". This would very easy to model:
The earlier photo attached shows them unloading a hopper trailer into the transload machine.
While working in the oil field, it was a different type of trailer used that would unload itself using the truck power to air pressure force the sand out of the trailer and into the well site storage unit.
Here, grain type hopper trailers gravity dump the load and the sand company leases the belted "transload" machine to fill the rail covered hoppers.