Good evening gang!
Had a good day today. After knocking out some chores this morning, I got to spend time in the basement. I was a little perturbed when they interrupted the "countdown to green" segment of the Nascar broadcast because of old Joe's announcement, then took 30 minutes explaining it all. I really think the media types just like to hear themselves yap all day. The whole thing could have been 3 minutes, tops.
NASCAR is now taking 2 weeks off because of the Olympics so I expect more progress in the next 2 Sundays.
Progress on the layout as the track buss is complete on the peninsula, through the wall and over the door, back through the wall and to the main part of the layout. I can also now run DC trains on that part of the layout. The DCC is under the main part of the layout, so I have to get crackin on the buss for that part.
The recent phone discussion brings this to mind. Its over the east yard, sooner or later I will have to move it to the other room.
My Father was a phone repairman. This phone has all it's internals still, so potentially it could still work. If need be it I had 2 of them I could use them with the layout, but since the east and west yards are separated by an aisleway it would be pointless.
SHERREL! Glad to hear from you!
Electrical work doesn't both me as much as plumbing does. In a lot of ways, electricity behaves a lot like water. You have a pressure side (+) and once the "work" is done, you have a drain (-) side. My problem my water pipes are prone to leaks, my wiring is solid. Well, different strokes for different folks!
The sandman calls, goodnite!