Well, the earliest build date on a GP40-2 was April, 1972 for the D&RGW. I assume they must have been the first to take delivery but the B&O had some built at about the same time so it might have been the B&O also. As an bonus question, who was the only non-railroad to take delivery of a new GP40-2?