well well well
where should i start.
lets start at the beginning, would maybe make sense

so. i was watching a youtube video the other day from a modelrailroader that finished hes swing down bridge to clear a gap in front of a door. and he had a great solution how it was done and this got me thinking.
as you all know, my shelf layout ends at section D (the Industry) because after that there is the door to enter the room.
but after that comes (a big mess) with lots of stuff. and i since the start was dreaming of one day, i will add something to reach this side. when i was watching this video i saw a clear idea. and last weekend i was at my moms house to pick up some storage racks. and boooom there was the idea.
i will tear down my storage space to the right of the door. will replace it under section C, and create room for Section E and F!
from section D i always had the mainline end right at the end of the module. so there are two ideas. the doted line would mean i also expand the track next to the mainline. with a slight curve and a bridge in section E. so i can get some tracks, to the back of the module.
the mainline will also run over a bridge in the front. the whole section E will be the lift up bridge module. that means, if i have to walk trough i will lift the bridge down, it will swing down so it will be hanging on the side of Section F.
Section F will be a yard. Maybe i will also build scenery there, but the main purpose will be, yard to maybe store locomotives and some cars.
if i build this, this would give me more or less 3m of additional tracks. what would be awesome!
yupp thats it.
will let you know after the weekend what i have done so far
Cheers
marco