Smudge617
Well-Known Member
I've noticed in the US, the usual method of fixing the road bed and track is to use some form of glue or caulk, which if your using a foam type surface, would realistically be the only way to ensure the track stays where you want it.
In my experience the UK doesn't, on the whole, use this method, we lay the roadbed and track directly onto our (usually) plywood base, some will still use glue to secure the roadbed and track, but it's a method I don't really like, especially if you find you only need to move the track 1 or 2 mm, it's a lot of work to remove the glue before you can re-lay the track that slight amount.
I don't use any glue except when ballasting or doing scenic's, spike's or nails are the usual method here, (although for the life of me, why nails??). I use screws, (which are the same size as nails) very easy to use and remove if I find I have to move the track slightly, maybe 10 seconds to do it, no prying, scraping, cleaning or need of a vacuum, holds both the roadbed, (I use 2mm cork underlay as the roadbed) and the track firmly in place.
In my experience the UK doesn't, on the whole, use this method, we lay the roadbed and track directly onto our (usually) plywood base, some will still use glue to secure the roadbed and track, but it's a method I don't really like, especially if you find you only need to move the track 1 or 2 mm, it's a lot of work to remove the glue before you can re-lay the track that slight amount.
I don't use any glue except when ballasting or doing scenic's, spike's or nails are the usual method here, (although for the life of me, why nails??). I use screws, (which are the same size as nails) very easy to use and remove if I find I have to move the track slightly, maybe 10 seconds to do it, no prying, scraping, cleaning or need of a vacuum, holds both the roadbed, (I use 2mm cork underlay as the roadbed) and the track firmly in place.
