Well, It's happened again. Have to take my train layout down again. The road behind my sisters house is going to be widened to 4 lanes & the county has told us we have to move. They have already given us a price for the house which is the going price with what I have added which will be xtra in the price. I'm going to have to sell the whole layout before the move. I figured it would take me about 2 or 3 months in my spare time to take the layout all apart. I now have 5 mainlines & 2 of them are raised all the way around the 14 by 24ft layout. This time I'm not shipping anything. Whatever anyone buys will have to be picked up here in Covington, Ga. Today I'm going to start boxing up everything in Banana Boxes & marking what is in each one w/pictures. I figured I will have to start picking up boxes at WM & other stores close to me. Shipping charges are supposed to go up 28% by May 10th. I have over 65 Diesels, 320 freight cars, Lots of spare parts, tons of Bachmann NS EZ Track & lots of other HO scale stuff. When I had my Trains shipped from Arcadia,Fl. in 2023 I did it w/a U-Pack cube & there was 44 Banana boxes then with a mess of track in round mailing tubes. Now, I've got a lot more than that. I'm keeping all of my Lego. This time when I move I have to go back to Arcadia. BTW everything in running gear is DC only.