Update on the Trainroom. 3-28-23. Covering on the outside wall, Windows in(7), All wiring done(12ga.) except for heat & air. Wired for receptacles on wall every 6 ft., plugs in ceiling for 4ft LED lights, 2 overhead fans, switch on both walls for front & back door, outside recepts., ouside LEd lights for both doors, LED shop lite on porch under Dormer(ceiling) wired up for a wall mounted heater & A/C. There will be 7 or 8 LED shop lites. I requested 12 ga. wire in the whole building. Seperate Breaker switch for both sides of the room & for the lights & fans, all seperate. Breaker box on the wall by the front door. Here's some photo's. Doors are next, then sheetrock, Flooring & interior paint. I'll keep you-all posted.