Kriegsloks building shops

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


The "Little Joe" EF4 has gotten the basic orange and was baking
IMG_20261005_165250071_HDR.jpg
IMG_20261005_165302081.jpg

Here it's out of the oven:
IMG_20261005_180406495.jpg
The other major color this will receive is black, but the masking and painting black will have to wait until the weekend. As the body was baking, i managed to solder the loose deck to a set of frames. Right now the main frames are baking in primer:
IMG_20261005_180329376_HDR.jpg
 
Today masking the body of "Little Joe" and painting:
IMG_20261011_111654625_HDR.jpg
IMG_20261011_111701177.jpg

Masking was tough because of the proximity of handrails and other details near the black field. It's in the oven now and I'll have to do few corrections before i start with the decals.
IMG_20261011_120132791_HDR.jpg

Main frames were also painted:
IMG_20261011_120724819_HDR.jpg
IMG_20261011_120743110_HDR.jpg

Time to tackle the guiding trucks, tbc...
 


I did a few touchups here and there and i finally scored decals for Milwaukee Road locomotive. So decals are going on:
IMG_20261017_213250624.jpg
IMG_20261017_213240074.jpg
IMG_20261017_213300797_HDR.jpg

I will not be able to put every signage on this locomotive because i just don't have a complete photographic record to look at, but the logos, "F" and maybe a few warnings will get to put on.
 
Work is slowly progressing on finishing painting of the EF-4 "Little Joe":
IMG_20261024_071840798.jpg
IMG_20261024_071848564.jpg
IMG_20261024_071901243.jpg
IMG_20261024_071914476.jpg
IMG_20261024_071941631.jpg

The only markings which are missing are the "E" in front of number 74 in number boards. I will have to mix and match those from different decal sets. The "74" are dry transfers which i immediately had to cover with a clear coat yesterday. Both pantographs had to be fixed since the soldering gave way on some details. Running gear was cleaned, tbc...
 
Work is slowly progressing on finishing painting of the EF-4 "Little Joe":View attachment 276336View attachment 276337View attachment 276338View attachment 276339View attachment 276340
The only markings which are missing are the "E" in front of number 74 in number boards. I will have to mix and match those from different decal sets. The "74" are dry transfers which i immediately had to cover with a clear coat yesterday. Both pantographs had to be fixed since the soldering gave way on some details. Running gear was cleaned, tbc...
I can picture the shell being suspended by a massive overhead crane in a locomotive shop. Nice work.
 






Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top