Iron Horseman
Well-Known Member
Beginning to plan model railroad pike in eanest, need ideas - part 1 background.
I have always said that doing a freelance is much harder than just modeling the prototype, so I've decided to cheat and do a protolance so at least 1/2 the work is done.
I am beginning to get serious about planning my model railroad. After years of deliberation and flip flopping of short line vs one road or the other, I keep coming back to the Colorado front range specifically the area about Pueblo. The cornerstone idea for the layout is to have the hanging bridge of the Arkansas River that is viewable from both the top of the Royal Gorge, as well as track side(river level). This should immediately let everyone know that there has to be a balcony 1000 scale feet (or 11.5 real feet) over that track. From that point eastward will be my model. The canyon will hide the entrance to the western staging area. The rest is up for debate at the moment.
As most of you also probably know the actual hanging bridge was built by the Canon City & San Juan Railroad during the battle for the gorge. Simultaneously, the Santa Fe was building east of Pueblo under the Pueblo & Arkansas Valley railroad name. Just a bit before this time the Union Pacific controlled Kansas Pacific under the name of Arkansas Valley Railway had built from Kit Carson Colorado SW into Los Animas, and then up river to La Junta Colorado. Parallel to that track from Los Animas to La Junta was the dreams of Pueblo business men the Pueblo & Salt Lake City. The route could not support one, let alone two, railroads. The UP withdrew and abandon the track (first non-mine or industry related trackage to be abandon in Colorado). The Pueblo & Arkansas Valley railroad acquired the bankrupt Pueblo & Salt Lake City. Later the Pueblo & Arkansas Valley acquired the Canon City & San Juan giving continuous line from the state line to the Royal Gorge. Unfortunately the end result of the legal battle of the gorge ended up giving the hanging bridge and rights to the Royal Gorge to the Denver & Rio Grande in the "Treaty of Boston". All of the above is real history.
In my railroad world the Treaty of Boston decision came out differently (fake history) such that either the Santa Fe won, or that both railroads had to share the trackage. Therefore, the question on the table is, "Where and how far would the Santa Fe main line have gone after it got through the Royal Gorge in both these scenarios?" Since this area is not going to be part of my layout why does it matter? Well, I am debating whether to model the Santa Fe 1st or 2nd district (or both) from the Kansas boarder to Pueblo. If the Santa Fe only gets to South Park and consequently Leadville, the 1st district will be very different than if they break through the Continental Divide and go straight to San Francisco or even NW to Portland or Seattle. So keeping in mind what the Colorado Midland, CB&Q, DSP&P, and the Moffat Route were doing in 1880, where would the "Pueblo & Arkansas River Valley" (my railroad) have been built to?
I have always said that doing a freelance is much harder than just modeling the prototype, so I've decided to cheat and do a protolance so at least 1/2 the work is done.
I am beginning to get serious about planning my model railroad. After years of deliberation and flip flopping of short line vs one road or the other, I keep coming back to the Colorado front range specifically the area about Pueblo. The cornerstone idea for the layout is to have the hanging bridge of the Arkansas River that is viewable from both the top of the Royal Gorge, as well as track side(river level). This should immediately let everyone know that there has to be a balcony 1000 scale feet (or 11.5 real feet) over that track. From that point eastward will be my model. The canyon will hide the entrance to the western staging area. The rest is up for debate at the moment.
As most of you also probably know the actual hanging bridge was built by the Canon City & San Juan Railroad during the battle for the gorge. Simultaneously, the Santa Fe was building east of Pueblo under the Pueblo & Arkansas Valley railroad name. Just a bit before this time the Union Pacific controlled Kansas Pacific under the name of Arkansas Valley Railway had built from Kit Carson Colorado SW into Los Animas, and then up river to La Junta Colorado. Parallel to that track from Los Animas to La Junta was the dreams of Pueblo business men the Pueblo & Salt Lake City. The route could not support one, let alone two, railroads. The UP withdrew and abandon the track (first non-mine or industry related trackage to be abandon in Colorado). The Pueblo & Arkansas Valley railroad acquired the bankrupt Pueblo & Salt Lake City. Later the Pueblo & Arkansas Valley acquired the Canon City & San Juan giving continuous line from the state line to the Royal Gorge. Unfortunately the end result of the legal battle of the gorge ended up giving the hanging bridge and rights to the Royal Gorge to the Denver & Rio Grande in the "Treaty of Boston". All of the above is real history.
In my railroad world the Treaty of Boston decision came out differently (fake history) such that either the Santa Fe won, or that both railroads had to share the trackage. Therefore, the question on the table is, "Where and how far would the Santa Fe main line have gone after it got through the Royal Gorge in both these scenarios?" Since this area is not going to be part of my layout why does it matter? Well, I am debating whether to model the Santa Fe 1st or 2nd district (or both) from the Kansas boarder to Pueblo. If the Santa Fe only gets to South Park and consequently Leadville, the 1st district will be very different than if they break through the Continental Divide and go straight to San Francisco or even NW to Portland or Seattle. So keeping in mind what the Colorado Midland, CB&Q, DSP&P, and the Moffat Route were doing in 1880, where would the "Pueblo & Arkansas River Valley" (my railroad) have been built to?
Last edited by a moderator:
