The greenbrier logging and coal co


Well, Slow but sure. Waiting on more parts right now. I did get to where i was able to pour the first coat of water on the top behind the waterfall. After that is dry it will need another coat. Have the trestle almost done with repairs. I have to build another one right beside it. and then the big one....Shots below, Smoke
 

Attachments

  • rsz_20181002_165111.jpg
    rsz_20181002_165111.jpg
    194 KB · Views: 310
  • rsz_20181002_165124.jpg
    rsz_20181002_165124.jpg
    174 KB · Views: 302
  • rsz_20181002_165149.jpg
    rsz_20181002_165149.jpg
    216.1 KB · Views: 296
  • rsz_20181003_160027.jpg
    rsz_20181003_160027.jpg
    90.9 KB · Views: 280
  • rsz_20181003_160102.jpg
    rsz_20181003_160102.jpg
    184.7 KB · Views: 319
  • rsz_120181003_181003.jpg
    rsz_120181003_181003.jpg
    92.4 KB · Views: 299
I was told by some of you that the way i had the mainline that railroads would never have laid the track down like i had it. So...I changed it. Shots below. Comments?? Smoke
 

Attachments

  • 20181005_165941.jpg
    20181005_165941.jpg
    255.7 KB · Views: 301
  • 20181005_170008.jpg
    20181005_170008.jpg
    412.3 KB · Views: 297
  • 20181005_165949.jpg
    20181005_165949.jpg
    328.1 KB · Views: 317
I have a couple of shots of my new service track. All of my loco needs together. Enjoy, Smoke
 

Attachments

  • 20181005_204420 (Copy).jpg
    20181005_204420 (Copy).jpg
    134.5 KB · Views: 300
  • 20181005_204433 (Copy).jpg
    20181005_204433 (Copy).jpg
    141.3 KB · Views: 292
Been working on the new trestle and rebuilt the one trestle over the falls area, I also started another for the waterfalls area. The one for the new section of layout is getting there. All new. I have two more bents and i can get it off the layout and finish it on my workbench. I need to finish the plaster in that section of the layout. Shots below and one extra i show as this is what i modeled mine after. Lots of fun, Smoke
 

Attachments

  • Smarrco Trestle at Manmoth.jpg
    Smarrco Trestle at Manmoth.jpg
    58.9 KB · Views: 309
  • 20181009_211250 (Copy).jpg
    20181009_211250 (Copy).jpg
    95.4 KB · Views: 299
  • 20181009_172616 (Copy).jpg
    20181009_172616 (Copy).jpg
    100.7 KB · Views: 300
Well the plaster is pretty much done. Have a couple of places where it got a ripple in it so i have to fix it. I worked last night on the trestle and was able to get about half of it done. today i was spraying the stain on and ran out of air so back to the store i go... Again. I got a couple of shots of the new area for the houses with the hill built up. Also the other side with the big trestle. Have everything working good right now. But with the trestle half done. it will be a few days till i get back to it. Shots below. I shot two different views of the trestle in front of the computer screen. It looks close to be. Have a good one, Smoke
 

Attachments

  • 20181010_195532 (Copy).jpg
    20181010_195532 (Copy).jpg
    102 KB · Views: 292
  • 20181010_195540 (Copy).jpg
    20181010_195540 (Copy).jpg
    78.1 KB · Views: 296
  • 20181010_195559 (Copy).jpg
    20181010_195559 (Copy).jpg
    85.1 KB · Views: 308
  • 20181012_162727 (Copy).jpg
    20181012_162727 (Copy).jpg
    97.1 KB · Views: 288
  • 20181012_162731 (Copy).jpg
    20181012_162731 (Copy).jpg
    131.9 KB · Views: 294
I let the trestles go for now. I am working on the houses and ran out of the windows i need. Having a small issue with getting morwe of them. Fifer has one more pack but i need three so i hope he can get more. One other thing, The damp weather here for the last couple of weeks have caused the houses to warp some. I may have to address that with more stiffeners to fix them. Couple of shots below, Smoke
 

Attachments

  • 20181013_160513 (Copy).jpg
    20181013_160513 (Copy).jpg
    80.6 KB · Views: 285
  • 20181013_160544 (Copy).jpg
    20181013_160544 (Copy).jpg
    119.7 KB · Views: 431
Still working on the trestles. They are finished but only one installed. Need to do some other things before i place them in place. Waiting on the windows to come yet. Have a idea how the houses will look set up. Have a few shots. Smoke
 

Attachments

  • 20181019_182700 (Copy).jpg
    20181019_182700 (Copy).jpg
    145.6 KB · Views: 283
  • 20181019_182732 (Copy).jpg
    20181019_182732 (Copy).jpg
    125.6 KB · Views: 273
  • 20181019_182745 (Copy).jpg
    20181019_182745 (Copy).jpg
    123.6 KB · Views: 279
  • 20181019_182811 (Copy).jpg
    20181019_182811 (Copy).jpg
    125 KB · Views: 283
  • 20181019_193353 (Copy).jpg
    20181019_193353 (Copy).jpg
    131.8 KB · Views: 276
Been giving the new sections a base coat of earth. The trestles are done and in place. Have more windows now so a few more houses getting done. A few shots below, Smoke
 
Still on the houses yet. Have second coat of water on the waterfall done. Still white.. Have some of the layout cleaned up. Have a issue with the river. Seems that the grass went on the river and stuck there. Not sure if i can wash it or paint the mod podge in a thin coat. Its also dull not shiny like water should be. Have all but 3 turnouts rewired and all but 3-4 hookups for the power from the dcc controller. Maybe i can run some trains this weekend...;)
 

Attachments

  • 20181022_161918 (Copy).jpg
    20181022_161918 (Copy).jpg
    111.5 KB · Views: 289
  • 20181022_161924 (Copy).jpg
    20181022_161924 (Copy).jpg
    87 KB · Views: 277
  • 20181022_161934 (Copy).jpg
    20181022_161934 (Copy).jpg
    157.2 KB · Views: 291
  • 20181022_161942 (Copy).jpg
    20181022_161942 (Copy).jpg
    108.2 KB · Views: 283
Have been working on track and turnouts. So far i have 9 of the 14 working correctly. Had to take a couple apart to clean them out before they would work. I had to loosen the track all around them so i have to lay down almost all the track on the board. I wish i didn't have to do it but thats the way it is sometimes. My work desk was set up for computer but i already had one so i took the keyboard slide out and am using it for the control board. Have a shot below of that, Smoke
 

Attachments

  • 20181025_145346 (Copy).jpg
    20181025_145346 (Copy).jpg
    102.6 KB · Views: 289
I have been busy around here with sick family so not much done. I did decide to change some of the new section. I made the waterfall with mod podge and it is looking fair but need to finish it up. I also made some changes to the new section. First coat of plaster is on and needs another coat yet. Not much else to add. have fun out there!!! Smoke
 

Attachments

  • 20181104_150126 (Copy).jpg
    20181104_150126 (Copy).jpg
    99.3 KB · Views: 257
  • 20181104_150133 (Copy).jpg
    20181104_150133 (Copy).jpg
    107.2 KB · Views: 257
  • 20181104_150139 (Copy).jpg
    20181104_150139 (Copy).jpg
    130.5 KB · Views: 253
Got the second coat of plaster cloth done. Have first two coats of Spackle done. Shots below. Also some of the painting of the rock wall done. The trestle area needs some more work yet so i will be working on that next. Later Smoke
 

Attachments

  • 20181106_193006 (Copy).jpg
    20181106_193006 (Copy).jpg
    91 KB · Views: 260
  • 20181106_193028 (Copy).jpg
    20181106_193028 (Copy).jpg
    116.2 KB · Views: 259
Have more done today than i thought i would. The trestle area i got today. not painted but ready for it. Shots below, Smoke
 

Attachments

  • 20181107_145652 (Copy).jpg
    20181107_145652 (Copy).jpg
    104.3 KB · Views: 246
  • 20181107_145704 (Copy).jpg
    20181107_145704 (Copy).jpg
    102.4 KB · Views: 256
  • 20181107_154153 (Copy).jpg
    20181107_154153 (Copy).jpg
    110.7 KB · Views: 256
  • 20181107_154208 (Copy).jpg
    20181107_154208 (Copy).jpg
    90.2 KB · Views: 256
  • 20181107_154640 (Copy).jpg
    20181107_154640 (Copy).jpg
    96.5 KB · Views: 252
And three more pic's as of today. I might be taking a few days off as i may be traveling to Maine to see my Brother-In-Law. He is not doing good! Will let you know when i know better for sure.
 

Attachments

  • 20181109_143716 (Copy).jpg
    20181109_143716 (Copy).jpg
    110.1 KB · Views: 240
  • 20181109_143707 (Copy).jpg
    20181109_143707 (Copy).jpg
    110.1 KB · Views: 231
  • 20181109_143703 (Copy).jpg
    20181109_143703 (Copy).jpg
    79.1 KB · Views: 242
I have been working on the layout as i can so i don't get caught up in the family in Maine. Debs brother is not getting better but worse. Not really helping me with my PTSD.... Working on the layout helps a lot!!Got all the track from the double bridge up to the logging camp glued down and checked with cars to see if anything got missed. Have the camp itself about done. Have lots of scenery to do, and giant mass trees to build and set. I think about 50 more trees on top of what i have on hand should do it. Not sure how much more i will get done before i have to go north. Shots below, Smoke
 

Attachments

  • 20181111_232224 (Copy).jpg
    20181111_232224 (Copy).jpg
    129.7 KB · Views: 235
  • 20181111_232248 (Copy).jpg
    20181111_232248 (Copy).jpg
    120.4 KB · Views: 241
  • 20181111_232258 (Copy).jpg
    20181111_232258 (Copy).jpg
    125.7 KB · Views: 236
  • 20181111_232321 (Copy).jpg
    20181111_232321 (Copy).jpg
    154.9 KB · Views: 249
  • 20181111_232330 (Copy).jpg
    20181111_232330 (Copy).jpg
    89.4 KB · Views: 261
  • 20181111_232338 (Copy).jpg
    20181111_232338 (Copy).jpg
    165.4 KB · Views: 242
  • 20181112_185735 (Copy).jpg
    20181112_185735 (Copy).jpg
    125.5 KB · Views: 233
  • 20181112_185811 (Copy).jpg
    20181112_185811 (Copy).jpg
    92.4 KB · Views: 233



Back
Top