Paint or Assemble First?

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Whether you're a master model railroader or just getting started, you'll find something of interest here.


Lady_Railfan

House Mother, Cheerleader
I'm going to add some crown molding to the window frames on my renovated hotel. I've already applied basecoat to one outside wall of the top half of the building. (I'm testing on one wall before I proceed.) The final color will be brown.

I'll use 1/2" wide x 3/16" thick extension of the window frame, topped with a 1/4" wide x 1/8" thick cap. I'll trim the ends of the cap at an angle to meet the edge of the window frame.

Is it better to assemble and prime the crowns before I attach them to the building, or should I glue them on first, then prime and paint them after?
 

KenKzak

Displaced D&H fan
I would be inclined to paint the strip wood/mouldings first, then cut to size and touch-up the ends.
In Nscale, I have little choice. With Gscale, you can do so much more in a prototypical fashion, but this way saves a lot of meticulous trim painting ON the model.

Ken
 

Lady_Railfan

House Mother, Cheerleader
THANKS, Ken! I was leaning to painting them first also, but novice that I am, I wanted an expert opinion. My concern was that the glue might not stick as well to painted surfaces as to raw wood. Painting first would cut down a lot on the tedious cutting-in! There will be enough of that as it is, since the window frames will be a different color from the walls.
 

jbaakko

Diesel Detail Freak
As long as the paint is sealed to the wood it should hold well enough, but then again its gonna be exposed to Socal weather, so...?
 

Red Oak & Western

Active Member
Claudia -

If I understand what you are doing, I would glue the cap to the facia, then paint the top, front, bottom, and ends, but not the back of the crown. That way you're getting the best of both worlds: gluing raw wood to raw wood, but painting the moulding before you apply it to the building.

Kj
 

Lady_Railfan

House Mother, Cheerleader
Kj, I hate to admit that I might have gone ahead merrily and painted everything, including the backsides. As it is, I have only primed half of one outside wall, so I can do as you suggest by finishing and mounting the crowns before I do any more painting. THANKS!

Josh, depending on your point of view, we're TOO close to the beach. The famous SoCal marine layer is much too familiar --- year 'round June Gloom where we are. As a result, I store the buildings inside most of the time. Still, I'm trying to do my best to make sure the paint stays where I put it. ;)
 

jbaakko

Diesel Detail Freak
Ahh, thats gotta be slightly annoying whan you wanna run trains and have to carry out a dozen or so buildings, one or 2 at a time!
 

Lady_Railfan

House Mother, Cheerleader
Not really too annoying. I keep most of the buildings on an old metal tea-cart, ready to wheel 'em out and set them on their tile pads. I can have the whole thing set up, populated, and ready to run in about 30 minutes, provided I haven't forgotten to charge the batteries.
 




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)


ModelRailroadForums.com is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to amazon.com

RailroadBookstore.com - An online railroad bookstore featuring a curated selection of new and used railroad books. Railroad pictorials, railroad history, steam locomotives, passenger trains, modern railroading. Hundreds of titles available, most at discount prices! We also have a video and children's book section.

ModelRailroadBookstore.com - An online model railroad bookstore featuring a curated selection of new and used books. Layout design, track plans, scenery and structure building, wiring, DCC, Tinplate, Toy Trains, Price Guides and more.

Top