2009 Update on my Christmas layout
I started working on the layout for under the tree again, I had hoped on finishing it right after Christmas last year but it got put on the back burner and here I am in crunch mode trying to finish it before Thanksgiving.
I uncovered it the last weekend of October and got to work. I finished my water/small pond area was going for a frozen icy look and I think I did pretty good since this was my first time working with a water sceen I used Envirotex for my water. Then I replaced a section of flex track on the inside loop, I was not happy with the rail joints at the small bridge, there is now one whole piece of flex track across the inner bridge no more rail joints before or after. I painted the sides of all the rails "rail brown" which came out great, real subtle most people won’t even notice but it looks fantastic.
Then I ballasted the track with WS med. gray blend which came out great.
I was going to snow cover the ties/roadbed and just have the rails sticking out of the snow but changed my mind for easy cleaning cause the snow gets dirty between the rails easily and to make it more kid friendly.
After the ballast I made my rail road crossings out of balsa wood and get them installed and was able to get my buildings out of storage and on the layout to figure out my tree placement, I'll have to work on removing the trees from there plastic bases this weekend but the basic idea is there.
I finished up painting my rock sections last night and got everything that will not get snow on it all taped off.
This weekend it will start snowing, I'll post more pics after I am all done.