Gee, awhile back i hooked everything i owned together, i think i mightve broke double-digits too!
Lol, i hate having a kids budget.
Ive got some stuff coming in the mail soon, assuming it all runs on my layout, i should have about a 16 car consist
, pulled by a total of 8 locomotives
Overkill? Nope, sir, these cars are filled with lead
For now heres a shot i took over the summer, not my longest consist, but the only train pics i have on the computer.
Heres Adirondack and Northern Ex-CP Rail 3018 and Ex- something 10 pulling a 4 car train through the gravel pit.