HO/HOn3 Apple River Canyon RR - First track plan w/AnyRail


Bob T

Member
Last time I designed a layout, it was pencil on paper. Ha. Here is my first track plan attempt with AnyRail 6.
Narrow gauge lead mining, with a standard gauge interchange, and eventually a port delivery.

Space is 12 ft along the back. 6' 6" on the left, and 10' 6" on the right. Necessary doorways on either side.
The plan for sections B and C are not complete, but section A is very close.

I hope to start construction, once A is finalized and material acquired.
Trying to leave the option of a loop, if point to point gets boring. Would need a lift out section though.

So what do you think? Welcoming all critiques, as I am no expert.

 
Last edited:



Back
Top