HO/HOn3 Apple River Canyon RR - First track plan w/AnyRail

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


Bob T

Member
Last time I designed a layout, it was pencil on paper. Ha. Here is my first track plan attempt with AnyRail 6.
Narrow gauge lead mining, with a standard gauge interchange, and eventually a port delivery.

Space is 12 ft along the back. 6' 6" on the left, and 10' 6" on the right. Necessary doorways on either side.
The plan for sections B and C are not complete, but section A is very close.

I hope to start construction, once A is finalized and material acquired.
Trying to leave the option of a loop, if point to point gets boring. Would need a lift out section though.

So what do you think? Welcoming all critiques, as I am no expert.

 
Last edited:




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top