TA-DA! Jim Hediger (yes, that Jim Hediger) answered my email to MR, and HERE'S THE LIST!!! (now everyone can add a Foundry to your layout.
Freytag's Foundry parts list
Detail Associates
1 2210 40-link chain (stack gantry)
1 2508 .019” brass wire
(crane conduits)
Evergreen styrene
2 14526 Corrugated sheet
(sheathing)
Plastruct
Plastruct codes
Plastruct codes its structural materials and tubing in 1/32” increments, so H-4 is 4/32”,
H-6 is 6/32, and so on.
1 AFS-4 1/8" angle (railing corners)
2 AFS-6 3/16" angle (trestles)
2 BFS-4 1/8" I-bean (crane cab)
10 BFS-6 3/16" I-bean (X-bracing)
5 BFS-12 3/8" I-bean (crane beams)
1 BFS-14 7/16" I-beam (crane trestle)
2 BFS-16 1/2" I-bean (crane)
2 CFS-6 1/8" channel (stack gantry)
5 E-6 90-degree 3/16" elbow
(reservoir pipe connections)
I E-18 90-degree 9/16"elbow
(blower ductwork)
1 EF-6 90-degree 3/16" elbow
(reservoir overflow vent)
1 EF-24 90-degree 3/4" elbow
(downcomer connection)
I HF-32 flanged cap (cupola stack)
I HFS-4 1/8" H-beam (stack gantry)
10 HFS-6 3/16" H-beam (craneway)
12 HRS-4 handrails (all railings)
1 HWL-4 handwheel
(reservoir valve)
10 MR-3O .030" rod
3 MR-60 .060" rod (conduits)
3 MS-40 .040" square (stack deck)
10 MS-6O .060" square
(reinforcement)
10 MS-125 .125" square
(reinforcement)
10 MS-250 .250" square
(reinforcement)
2 MS-204 .020" x .040"(hinges)
2 MS-210 .020" x .100" (panels)
2 MS-219 .020" x .187" (gutters)
1 MS-225 .020" x .250" (trestle)
2 MS-306 .030" x .060" (crane cab)
1 MS-316 .030" x .156" (gussets)
10 MS-325 .030" x .250" (gussets)
10 MS-419 .040" x .187" (canopy)
1 MS-425 .040" x .250" (landing)
10 MS-608 .060" x .080" (bracing)
10 MS-610 .06" x .100" (bracing)
10 MS-612 .060" x .125" (cupola roof)
10 MS-810 .080" x .100" (x-bracing)
10 MS-812 .080" x .125" (x-bracing)
10 MS-816 .080" x .187" (roof)
1 MS-1925 .187" x .250 (gear box)
1 M-2 motor (blower)
3 M-3 motors (gantry crane)
1 N-24 nozzle (downcomer)
1 PS-10 corrugated sheet (roof)
5 RI-24 rings (dust collector)
5 RI-32 rings (downcomer)
1 RTFS-10 5/16" x 1/4" (gear box)
1 RTFS-12 1/4" x 3/8" (gear towers)
5 SC-6 clips (pipe supports)
1 SC-24 clip (downcorner)
1 SSS-103 .030" sheet
1 SSS-104 .040" sheet (scrap bins)
4 SSS-10624 .060" sheet
2 SRS-4 stair railings
2 STAS-4 stairs
1 STFS-8 1/4" square tube
(column footers)
1TB-2 1/16" tube (stanchions)
1TB-4 1/8" tube (crane drive line)
1 TB-6 3/16" tube (reservoir)
1 TB-18 9/16" tube (intake duct)
1 TB-24 3/4" tube (downcomer)
1 TB-32 1" tube (downcomer)
1 TB-40 11/4" tube (cupola stack)
1 TFS-6 3/16" tube (drive line collars)
6 TPO-6 3/16" tee (reservoir valves)
1 TPS-40 11/4" stub-In tee (stack)
1 UFS-6 3/16" channel (guides)
1 VC-5 cone set (stack base)
Note: Substitutions may be made among the various detail pails. However, changing the sizes at the tubing and structural items may cause difficulty getting the major subassemblies to fit properly during final assembly.