This view shows the two switches used for the S&A
area to gain access to both sidings.
Btw: The use of the sound board for a base is working out very well so far, I'm using the lighter of the two sides to attempt to a more natural looking background for any dirt or bushes I might want...
Trying to show the distressing done on a few ties just prior to the start of the Curved switch leading to the Serpha Copper & Iron Works and Anglin Oil Works as well as the Noth South Main Line and the Anglin Oil loading facility sideing for more convient loading through the overhead pipe...
A wide angle view showing the sideings and main line of he Serpha Copper & Iron Works and the Anglin Oil Facility. The main line passes near the embankment with the wood retaining wall.
The maskig tape in the picture was used to cover the extra black lines drawn to determine my final...