lead


  1. Tie Distressing

    Tie Distressing

    Trying to show the distressing done on a few ties just prior to the start of the Curved switch leading to the Serpha Copper & Iron Works and Anglin Oil Works as well as the Noth South Main Line and the Anglin Oil loading facility sideing for more convient loading through the overhead pipe...
  2. High Lead

    High Lead

    Class A climax backing into the heel boom area where the logs will be loaded and taken to the sawmill.



Back
Top